No, l'area di imbarco F è quella che andrà a sostituire il T2 e il molo A, quello a cui credo tu ti riferisca, sarà l'estensione del T1
"Boarding Area F. Boarding area F (formerly Pier C) will host 14 boarding gates equipped with loading bridges, some of which for class E and F aircraft. A new BHS/HBS system will be installed at apron level. Access to boarding area F will take place via an aerial link with the front portion of T3.
Boarding Area A. The new pier at the eastern end of the terminals system will be structured over two floors and a mezzanine, dedicated to passengers. In total there will be 14 gates with loading bridges and 10 remote gates. The connection to T1 will be via an elevated passage which will lead to an extension of the Front portion of Terminal 1.
http://www.adr.it/web/aeroporti-di-r...boarding-areas"
Simpatico ricordare che nei piani AZ il molo E doveva essere loro riservato