Dal NOP Portal (robetta cinese che rientra oggi 04NOV):
A big portion of Spanish Airspace has been regulated (with a period of 0 rate) due to the re-entry of rocket CZ-5B.
Please refer to the dedicated entry in the NOP. High delays all morning.
FMM
Sectors DZ -EK - AJ - BT regulated with 0 rate due to airspace rocket
LECM (Madrid)
TLU sector regulated due to the re entry of Rocket. In addition, several scenarios are applied to help balance the loads between
upper and lower sectors.
High delays.
A big portion of Spanish Airspace has been regulated (with a period of 0 rate) due to the re-entry of rocket CZ-5B.
Please refer to the dedicated entry in the NOP. High delays all morning.
FMM
Sectors DZ -EK - AJ - BT regulated with 0 rate due to airspace rocket
LECM (Madrid)
TLU sector regulated due to the re entry of Rocket. In addition, several scenarios are applied to help balance the loads between
upper and lower sectors.
High delays.