...e come se non bastasse...
On Wednesday, the FAA announced it is requiring airlines that operate Boeing 737 Next Generation (NG) aircraft to inspect these older aircraft for structural cracks.
Boeing 737 NGs with more than 30,000 cycles must be inspected within seven days, while planes between 22,600 and 29,999 cycles must be inspected over the next 1,000 cycles of the aircraft.
On Wednesday, the FAA announced it is requiring airlines that operate Boeing 737 Next Generation (NG) aircraft to inspect these older aircraft for structural cracks.
Boeing 737 NGs with more than 30,000 cycles must be inspected within seven days, while planes between 22,600 and 29,999 cycles must be inspected over the next 1,000 cycles of the aircraft.