According to Turkish press, Stage 1 will be as follows:
- One main terminal with 680,000 sqm
- One additional terminal/ satelite building with 170,000 qm - the total capacity of both terminals will be 90 mln passengers per year
- 88 passanger gates
- Car park for 12,000 cars
- three independent runways, beeing able to handle widebody aircrafts like a380 or 777 + 8 taxi ways;
- 3.1 mln sqm apron
This first stage shall be completed until 2017.
Stage 2 until 2019:
- additional terminal
- additional runway + 2 taxiways + additional taxiways for existing runways
- 1 mln sqm apron
Stage 3 until 2021:
- additional terminal
- additional runway + 2 taxiways + additional taxiways for existing runways
- 1.3 mln sqm apron
Stage 4 until 2023:
- additional terminal
- additional runway + 2 taxiways + additional taxiways for existing runways
- 0.9 mln sqm apron
Facts about the final airport:
- 1.5 mln sqm closed area
- capacity of 150 mln passangers per year
- 6 runways (4 being vertical two the sea, 2 beeing parallel) all beeing able two handly all kind of aircraft
- 16 taxiways
- 165 gates
- one air trafic control tower and 8 additional control tower
- rail transportation between the terminals
- 3 techninal bloks
- parking space for 500 aircraft with apron of 6.5 mln sqm
- parking lots for 70,000 cars
- additional facilities for hospital, hotels, fire brigade, church/ mosque, congress center, waste recycling and water treatment
http://ekonomi.haberturk.com/airport/haber/790467-3uncu-havalimani-kaca-mal-olacak